T.B. MB 10/2005Operating InstructionsEnglishABSORPTION - REFRIGERATOR for CARAVAN and MOTORHOMERM 7601 LRM 7605 LRM 7651 LRM 7655 LRM 7801 LRM 7805 LR
Frame heating Additional functions (RM 76x5 L, RM 78x5 L only)Temperature setting cooling compartmentAs shown, you are able to regulate the temperatu
11Making ice cubesIce cubes are best frozen overnight. At night, the refrigerator has less work to do and the unit has more reserves.DefrostingAs time
12Door lockingSwitching offWinter operation1. Check that the ventilation grills have not been blocked by snow, leaves or similar.5.82. When the ambien
13Interior lightChanging the light bulbsChanging the decor panelDimensions of the panels in mm:Model Height Width ThicknessRM 7601/ RM 7605 (flat door
14Changing the doorhang5.12It is not always possible to change the door when the refrigerator is installed.1. Remove rotary knobs and unscrew control
15Troubleshooting5.13Failure : The refrigerator does not work in gas operation mode.Possible cause Action you can takea.) Gas bottle empty.b.) Is the
16Maintenance Works on gas components and electical installation may only be carried out by authorised personnel. We recommend to contact your Domet
17Technical dataWe reserve the right to make technical changes.*Average consumption measured at an average ambient temperature of 25°C in pursuance of
18INSTALLATION GUIDEOn installation of the appliance, the technical and administrative regulations of the country in which the vehicle will first be u
19Draught-free installationThe refrigerator must be sealed in accordance with EN 1949.Illustrated below is a typical approved method of sealing.Propos
2DanskDeutschΕλληνικάEnglishEspañolFrançaisItalianoNederlandsNorskPortuguêsSuomiSvenskvia INTERNETwww.dometic.comCustomer ServiceInstructions for stor
20Ventilation and extractionA correct installation is important for correct operation of the appliance to ensure, there is no build-up of heat at the
21Installing the ventilation system6.43. Insert the ventilationgrilles.5. Insert winter cover2. Insert the frame andscrew into position.2 . Place the
22Installation recessThe refrigerator must be installed draught-free in a recess (see “6.2”). The measurements of the recess are given in the table be
23Connections for gas / electrical installationGas installationThe rules in point 6.1 must be adhered to.When running on gas, these appliances are
Inflamable material should not be in immediate proximity to the burner.The gas connection to the appliance is effected by means of a suitablecoupl
25Electrical installationElectrical installation may only be carried out by qualified personnel.The connection cables must be laid in such a way that
26D+connection and Solar Control connection( AESonly )D+ connectionThe D+ control connection must be connected to the respective vehicle terminal (alt
Wiring diagramWiring diagram for RM 76x1 L / RM 78x1 L276.9.6Connections:A = Ground heating element DCB = Plus heating element DC C = Ground electroni
28Wiring diagram for RM 76x5 L / RM 78x5 LConnections:A = Ground heating element DCB = Plus heating element DC C = Ground electronicsD = Plus electron
3TABLE OF CONTENTS1.0 INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 42.0 FOR YOUR SAFETY . . . . . . . .
Dometic GmbHIn der Steinwiese 16D-57074 Siegenwww.dometic.de/caravanwww.dometic.com
4INTRODUCTIONYou have made an excellent choice in selecting the Dometic Absorption Refrigerator.We are sure that you will be fully satisfied with your
5WARRANTY AND CUSTOMER SERVICEWarranty arrangements are in accordance with EC Directive 44/1999/CE and the normal conditions applicable for the countr
6Using the refrigerator The cooling unit is silent in operation. When the appliance is first put into operation, there may be a mild odour which wi
7Electrical operation1. 12V - operation (DC)The refrigerator should only be used while the motor is running, otherwisethe on-board-battery would be di
8Gas operation1. Open the valve of the gas cylinder2. Open the shut-off valve to the gas supply. The ignition process is activated automatically, acco
230 V - operationIf sufficient supply voltage is available (more than 200V), this power source is selected as the first option ( no solar-system insta
Comentarios a estos manuales